Unyielding 24/7 preventative maintenance and critical incident SLA rapid-response for high-asset technology environments. Secure absolute availability.
Contact Us"Revamp is an unwanted project where nobody takes liability. We are happy to shine!"
Expert handling of highly complex, mission-critical infrastructure upgrades without halting core operations.
Comprehensive site evaluation, facility gap analyses, physical risk assessments, and targeted availability audits.
Unmatched detailed planning, dynamic scheduling, and execution capability engineered to deliver enhancements entirely without downtime.
Forensic trouble-shooting, ATS stress testing, and exhaustive comprehensive capacity/performance loads on UPS and CRAC units.
Our operational framework mitigates critical operational risk, structurally eliminates potential downtime, and continuously enhances your DC site's overall lifespan and efficiency.
Select a guaranteed response matrix appropriate for your infrastructure's criticality.
| Feature | GOLD | SILVER | BRONZE | BASIC |
|---|---|---|---|---|
| Coverage Mode | 24x7 | 24x7 | 8x5 | 8x5 |
| Min. Response Time | 2 Hours | 4 Hours | 24 Hours | 48 Hours |
| Target Resolution Time | 12 Hours | 24 Hours | 48 Hours | 10 Days |
| Preventive Visits |
Comprehensive (UPS, CCU, others) |
Moderate | - | - |
| Spare Parts | Included | Not Included | Not Included | Not Included |
Real-time monitoring, alarming, trending and deep analysis of Data Centers and Mission Critical infrastructure to flawlessly achieve strict SLAs.
Annual Maintenance Site A
IT load: 400 kW
Racks: 116 racks
Duration: 12 months
Location: Abu Dhabi
Modular Data Center Maintenance Site B
IT load: 160 kW
Racks: 32 racks
Duration: 12 months
Location: Abu Dhabi
Data Center Annual Maintenance
IT load: 160 kW
Racks: 30 racks
Duration: 48 months
Location: Abu Dhabi
Data Center Annual Maintenance
IT load: 200 kW
Racks: 30 racks
Duration: 48 months
Location: Abu Dhabi
Data Center Annual Maintenance
IT load: 250 kW
Racks: 32 racks
Duration: 36 months
Location: Abu Dhabi
Data Center Annual Maintenance
IT load: 120 kW
Racks: 24 racks
Duration: 12 months
Location: Dubai
Don't wait for latency, hardware failure, or critical faults. Get proactive SLA coverage today.